
The unit was securely connected to the boom crane’s hoist using steel cables. It was gently lifted off the truck (for safety!).

High in the sky, the unit was hauled up, and carefully maneuvered toward the roof. Imagine trying to tug and pull that air conditioning unit up a ladder (however, the workers that were doing the job told us – they have!!).
Then, the unit was positioned on its prepared pad, ready to be connected to the duct work inside the new computer lab.
No comments:
Post a Comment